+7 (843) 528-03-88 Send a request

ARS LLC · Azbuka Remonta i Stroitelstva

Precision. Reliability. Results.

Full-cycle electrical installation and commissioning at petrochemical facilities

I&C and electrical installation up to 10 kV, commissioning, process control systems to the client’s design. Tatarstan and neighbouring regions of Russia.

  • SRO member · reg. No. SRO-S-014-23062009
  • Staff certified by Rostekhnadzor
  • Especially hazardous and technically complex facilities
  • 15+years of team experience in petrochemicals
  • Team — 30 top specialists
  • 50+completed jobs in petrochemicals and power
  • 10 kVvoltage limit for electrical works

About ARS

ARS LLC (Azbuka Remonta i Stroitelstva) performs electrical installation and commissioning at petrochemical and power facilities.

The company carries out planned works to the client’s schedule. A team of 30 top specialists is reinforced to match the project scope.

Regions: Tatarstan, Nizhny Novgorod Region, Chuvashia, Ufa.

  • 2020company registered
  • 15+years of team experience
  • 30top specialists

How we work

Seven stages: from site preparation to equipment start-up. Scroll down — the build progresses with the page.

Watch the video 40 s Skip Captions in Russian
  1. 01 Site preparationA new unit inside an operating plant
  2. 02 Foundations and substationPackage substation and pump unit, each on its own foundation
  3. 03 Steel frame and rackRoute from the substation to the consumer
  4. 04 Cable support systemsBrackets and posts, shelves, trays
  5. 05 Cable layingPower and control lines along the trays
  6. 06 Panel connectionCable termination, marking, wiring to terminals
  7. 07 CommissioningCircuit check, energising, equipment start-up

Special working conditions

ARS crews work where installation and commissioning are subject to special requirements.

More on working conditions
  • Hazardous areas

    Petrochemical units with explosive atmosphere zones.

  • Operating plants

    Works on the premises of a running facility.

  • Work at height

    Installation on elevated platforms, pipe racks and steel structures.

  • Confined spaces

    Works in congested units and rooms.

Why ARS

  1. 01

    Full cycle: from installation to commissioning

  2. 02

    Flexible and prompt decision-making

  3. 03

    Deadlines met, quality handover

  4. 04

    15+ years of experience at petrochemical facilities

  5. 05

    A team proven at the largest enterprises of Tatarstan

Projects

50+completed jobs at petrochemical and power facilities

Largest project

EP-600 — new olefins production complex

Nizhnekamskneftekhim (NKNH)

Participation in the project

Reference list*

  • Nizhnekamskneftekhim (NKNH)
  • Kazanorgsintez
  • TAIF-NK
  • Kuibyshev Oil Refinery JSC
  • TGK-16
  • FKP “Kazan State Gunpowder Plant”

*sites where ARS LLC employees performed the work directly

Photos on the site are illustrative. Photos from sites will be added once approved by clients.

Permits and certificates

SRO membership

Organisation
Self-regulatory organisation “Sodruzhestvo Stroiteley Respubliki Tatarstan”
SRO reg. No.
SRO-S-014-23062009
Register No.
3029
Liability level
1st, up to RUB 90 million per contract
Scope
Especially hazardous, technically complex and unique facilities, except nuclear power
  • Rostekhnadzor certification

    Trained and certified specialists

    In place
  • Electrical safety

    Qualification groups up to 1000 V

    In place
  • Industrial safety

    Staff certification

    In place
  • EMERCOM licence

    Fire alarm and fire safety systems

    Being obtained
  • Electrical laboratory

    Being set up
  • Copies of documents are provided on request of the tender department.

    Request documents

Send a request

Describe the task. An ARS specialist will contact you by phone to work it out.

+7 (843) 528-03-88
office@azbukars.ru